Description
Client called, tub overflow from 2nd floor bathroom to kitchen ceiling. Affecting drywall and 1 light fixture. Not sure if Out of Pocket of Insurnace. Built in 1989 4bed 3.5bath
Financial Summary
Job Total
$0
Collected
$0
Balance
$0
Financial Overview
Status: pending
Scheduling Alignment
Smart Recommendations
No financial baseline approved — complete intake before moving to execution.
No scheduling events exist for this project — assign to the scheduler.
Keep financial intake updated as project scope evolves.
No phases scheduled yet
Apply the General / Multi-Trade template, choose a different one, or add a blank phase.
Site Assessment & Scope Confirmation
Walk-through to confirm and lock scope.
Mobilization & Setup
Equipment, materials, crew mobilization to site.
Phase 1 Work
First trade or work block — customize as needed.
Phase 2 Work
Second trade or work block.
Quality Control Inspection
Internal QC before final walk.
Final Walk & Sign-Off
Client or adjuster final walk, sign-off, close-out.
Client Portal
Inactive · Gabriel Rocklin
Project Media
0 files
Drag & drop photos, videos, or PDFs here, or browse
JPG, PNG, HEIC, MP4, MOV, PDF supported
Project Updates
Materials used 1 5/8 sheet of drywall One bag of 45 minute mud Two Sanders One sanding block One 9 inch roller White paint Two cut brush One air scrubber 70 feet of Ramboard 80 feet of plastic One roll of green tape Two roll of blue tape One drill One sawZaw Drywall nails Dust pan/ broom
Status changed from "Need to Schedule" to "Job completed (open invoice)"
Status changed from "Job Underway" to "Need to Schedule"
Add Update
RECON
0 messages
No messages yet
Start the conversation for this project
Shift+Enter for new line · type @ to mention a teammate
2/6/2026
Created
2/17/2026