Description
Notes from Q: Sarah, Call summary Spoke with homeowner. The fire happened Saturday night around 2:30-3am. she was up cooking an left the stove on. A plastic bowls nearby in caught on fire Inside the kitchen. I asked homeowner was there any damaged cabinets she said no just a lot smoke damage all thew her house I’m guessing she call the fire before anything can burn really. It’s a 1 bedroom 1 bath apartment. She is sending over photos now. Yes she is going thew insurance a filed a claim already a will send that number over too. She asked for a late inspection 5pm because she is at work. She stated that her insurance company want her to get a cupl quotes. I will give further details when I get them. Built in 1963.
Address
625 W Wrightwood ave Unit 527 Chicago, IL 60614
Phone
630-988-1981Scheduled
Financial Summary
Job Total
$0
Collected
$0
Balance
$0
Financial Overview
Status: approved
Scheduling Alignment
Smart Recommendations
No scheduling events exist for this project — assign to the scheduler.
Verify actual hours against approved baseline as work progresses.
Keep financial intake updated as project scope evolves.
Scope & Permit Review
Emergency Board-Up & Tarping
Emergency Response / Pack-Out
PPE & Safety Protocol Setup
Structural Assessment
Containment Setup
Containment Setup
Scope & Permit Review
Emergency Response / Pack-Out
Structural Assessment
Emergency Board-Up & Tarping
Structural Assessment
Structural Assessment
Emergency Response / Pack-Out
Scope & Permit Review
Structural Assessment
Structural Assessment
Emergency Extraction / Demo
Emergency Response / Pack-Out
Containment Setup
Emergency Response / Pack-Out
Subcontractor Inspection
Moisture Mapping & Documentation
Moisture Mapping & Documentation
Emergency Board-Up & Tarping
Contents Inventory & Pack-Out
Emergency Board-Up & Tarping
HEPA Air Filtration Deployment
Subcontractor Inspection
Emergency Board-Up & Tarping
Containment Setup
Moisture Mapping & Documentation
Biohazard Material Removal
Emergency Board-Up & Tarping
Moisture Mapping & Documentation
Moisture Mapping & Documentation
Emergency Board-Up & Tarping
Emergency Board-Up & Tarping
Sub-Contractor Scheduling
Contents Inventory & Pack-Out
HEPA Air Filtration Deployment
HEPA Air Filtration Deployment
Structural Assessment
Drying Equipment Placement
Sub-Contractor Scheduling
Sub-Contractor Scheduling
Drying Equipment Placement
Mold-Affected Material Removal
Mold-Affected Material Removal
Contents Inventory & Pack-Out
Drying Equipment Placement
Structural Assessment
Contents Inventory & Pack-Out
Contents Inventory & Pack-Out
Drying Equipment Placement
Contents Inventory & Pack-Out
Drying Equipment Placement
Disinfection — Round 1
Drying Equipment Placement
Contents Inventory & Pack-Out
Mold-Affected Material Removal
Framing & Rough-In
Contents Inventory & Pack-Out
Debris Removal
Daily Monitoring
Debris Removal
Debris Removal
Inspections
Debris Removal
Framing & Rough-In
Debris Removal
Daily Moisture Monitoring
Demo of Unsalvageable Materials
Debris Removal
Debris Removal
Daily Monitoring
Framing & Rough-In
Daily Monitoring
Antimicrobial Treatment
Antimicrobial Treatment
Debris Removal
Demo of Unsalvageable Materials
Odor Control Treatment
Antimicrobial Treatment
Smoke & Soot Cleaning
Smoke & Soot Cleaning
Inspections
Smoke & Soot Cleaning
Equipment Pull + Final Check
Smoke & Soot Cleaning
Demolition of Unsalvageable Material
Demolition of Unsalvageable Material
HEPA Vacuuming & Surface Cleaning
Smoke & Soot Cleaning
Disinfection — Round 2 / ATP Testing
Insulation
Demolition of Unsalvageable Material
Smoke & Soot Cleaning
Daily Monitoring
HEPA Vacuuming & Surface Cleaning
Daily Monitoring
HEPA Vacuuming & Surface Cleaning
Inspections
Smoke & Soot Cleaning
Smoke & Soot Cleaning
Deodorization / Ozone Treatment
Deodorization / Ozone Treatment
Equipment Removal & Final Dry Check
Drywall & Finishing
Waste Disposal Documentation
Post-Remediation Verification (PRV)
Deodorization / Ozone Treatment
Equipment Removal & Final Dry Check
Containment Removal
Deodorization / Ozone Treatment
Equipment Removal & Final Dry Check
Insulation
Post-Remediation Verification (PRV)
Equipment Removal & Final Dry Check
Deodorization / Ozone Treatment
Insulation
Deodorization / Ozone Treatment
Deodorization / Ozone Treatment
Documentation + Sign-Off
Deodorization / Ozone Treatment
Equipment Removal & Final Dry Check
Mold Assessment (if needed)
Post-Remediation Verification (PRV)
Reconstruction Handoff
Air Quality Testing
Mold Assessment (if needed)
Containment Removal
Mold Assessment (if needed)
Mold Assessment (if needed)
Air Quality Testing
Drywall & Finishing
Paint & Interior Finishes
Mold Assessment (if needed)
Clearance & Handoff
Drywall & Finishing
Air Quality Testing
Containment Removal
Air Quality Testing
Air Quality Testing
Reconstruction Handoff
Reconstruction Handoff
Reconstruction Handoff
Reconstruction Handoff
Reconstruction Handoff
Reconstruction Handoff
Reconstruction Handoff
Reconstruction Handoff
Reconstruction Handoff
Reconstruction Handoff
Flooring
Reconstruction Handoff
Reconstruction Handoff
Reconstruction Handoff
Paint & Interior Finishes
Paint & Interior Finishes
Reconstruction Handoff
Final Punch & Certificate of Occupancy
Flooring
Flooring
Final Punch & Certificate of Occupancy
Final Punch & Certificate of Occupancy
Client Portal
Not set up · Sara McGreal SMK/FRE
Project Media
0 files
Drag & drop photos, videos, or PDFs here, or browse
JPG, PNG, HEIC, MP4, MOV, PDF supported
Project Updates
Status changed from "Incoming Projects" to "Need to Schedule"
called and left voicemail to check on status
Inspection confirmed by quinntin for 5pm today
Add Update
Sara McGreal SMK/FRE
0 messages
No messages yet
Start the conversation for this project
Shift+Enter for new line · type @ to mention a teammate
3/3/2026
Created