someone else came out, tried to find leak in multilevel home bedroom in top roof is above all that openned up ceiling over course of 6-12 months when the rain came in start to see leak that comes on opposite end and water rolls the openning he oppened and couldnt find where its coming from in the roof some mold forming
Address
1411 S Campus Parkway chicago, IL 60608
Phone
3125430208Created
3/11/2026
Financial Summary
Job Total
$0
Collected
$0
Balance
$0
Financial Overview
Status: pending
Scheduling Alignment
Smart Recommendations
No financial baseline approved — complete intake before moving to execution.
No scheduling events exist for this project — assign to the scheduler.
Keep financial intake updated as project scope evolves.
Containment Setup
HEPA Air Filtration Deployment
Mold-Affected Material Removal
HEPA Vacuuming & Surface Cleaning
Antimicrobial Treatment
Encapsulation
Containment Removal
Reconstruction Handoff
Client Portal
Not set up · Deborah Spyer
Project Media
0 files
Drag & drop photos, videos, or PDFs here, or browse
JPG, PNG, HEIC, MP4, MOV, PDF supported
Project Updates
Estimates emailed to client. Estimates uploaded to file.
Remediation total: $2,100.00 Touchstone original total: $3,700 and $700 Our 30% added to each, new total: $4,810 and $910
Homeowner will like to complete the work on the brick outside before she starts mitigation.. spoke with Mario he is waiting until weather breaks to complete the job.. In the meantime while the homeowner we like an estimate on both jobs that needs to be completed Also the homeowner will like to use us for recon as well
Status changed from "Need to Schedule" to "Inspections (Completed)"
Q is going to inspection 9:30am tomorrow
Inspection set for tomorrow at 9:30am
Mario completed inspection, spoke to client, all good wants to move forward mario doing estimate, Q reaching out to do inspection we will give estimate next week